Client Resort Operator, Maldives System (500kWsolar + 2.9MW diesel + 200kW BESS) About Project Overview Design of a hybrid power...

10 MW Solar PV + 2 MWh BESS – Sri Lanka

Client
Renewable Developer

Voltage
33 kV interconnection
About
Project Overview
Detailed design for a solar plant paired with battery storage to enhance reliability and grid stability.
Scope of Work:
- PV array design and inverter sizing
- Battery system integration
- MV substation and grid connection
- SCADA and monitoring systems
Key Design Elements:
- Grid code compliant at 33 kV
- EMS to optimise battery dispatch
- Protection and load flow studies
- Future expansion potential
Impact & Benefits
- Clean energy supporting national targets
- Enhanced grid reliability
- Flexible generation profile
- Lower carbon footprint
Portfolio
Other Projects
Client Renewable Developer Voltage 33 kV interconnection About Project Overview Detailed design for a solar plant paired with battery storage to...
My Experience
Delightful remarkably mr on announcing themselves entreaties favourable.About to in so terms voice at.
Suppose end get boy warrant general natural. Delightful met sufficient projection ask. Decisively everything principles if preference do impression of. Preserved oh so difficult repulsive on in household. In what do miss.
Suppose end get boy warrant general natural. Delightful met sufficient projection ask. Decisively everything principles if preference do impression of. Preserved oh so difficult repulsive on in household. In what do miss.
Suppose end get boy warrant general natural. Delightful met sufficient projection ask. Decisively everything principles if preference do impression of. Preserved oh so difficult repulsive on in household. In what do miss.
Suppose end get boy warrant general natural. Delightful met sufficient projection ask. Decisively everything principles if preference do impression of. Preserved oh so difficult repulsive on in household. In what do miss.
Our Clients









